Work in Hand

 

 

Sand inboard side of bulwarks, apply Yacht Primer and white Toplac.

 

Fit LED deck light strips to underside of capping.

 

Scrape off deck coatings from Cascover deck covering on decks, cabin roof and wheelhouse roof, applying epoxy/fibreglass to any cracks, seams or suspect areas.  Sand down surfaces, apply primer and non-slip deck paint. (Note: Existing Cascover is watertight across entire deck).

 

Repaint superstructure with Epifane's Yacht Enamel or International Woodskin as appropriate.

 

Lower masts and fit 5-core cable to main mast for masthead electrics.  Replace bulbs in navigation lights with LED equivalents.  Apply Woodskin to both masts and treat all blocks with light anti-seize grease.

 

Install new navigation system to existing Pinta Auto-Pilot chain drive and connect to NMEA 2000 network.  Install Garmin 1800 radar and connect to NMEA 2000 network.

 

Lift boat, apply 3 year white antifouling below waterline and up to top of existing boot top line.

 

 

Print Print | Sitemap Recommend this page Recommend this page
OFFERS SUBJECT TO AVAILABILITY © 2021 WAW Services
Additional photos by Argyll Cruising, Alison Mary Ashton and others - All rights reserved
ALL OFFERS SUBJECT TO AVAILABILITY