Work in Hand

(for completion by

31 December 2018)

 

Sand inboard side of bulwarks, apply Yacht Primer and white Toplac.

 

Fit LED deck light strips to underside of capping.

 

Scrape back deck coatings where cracked or “blown” from Cascover deck covering.  Apply epoxy to any cracks, seams or suspect areas.  Sand down surfaces , apply primer and non-slip deck paint. (Note: Existing Cascover is watertight across entire deck).

 

Lower masts and fit 5-core cable to main mast for masthead electrics.  Replace bulbs in navigation lights with LED equivalents.  Apply Woodskin to both masts and treat all blocks with light anti-seize grease.

 

Install new navigation system to existing Pinta Auto-Pilot chain drive and connect to NMEA 2000 network.  Install Garmin 1800 radar and connect to NMEA 2000 network.

 

Lift boat, apply antifouling and white enamel bootstrap.

 

 

Print Print | Sitemap Recommend this page Recommend this page
© 2018 WAW Services
Additional photos by Argyll Cruising, Alison Mary Ashton and others - All rights reserved